
Palmira
Kitchen Remodel
Tool.
Palmira Kitchen Remodel at a Glance.
Palmira Kitchen Remodel Tiers.
Palmira Kitchen Remodel Ideas
Estimate Your Palmira Kitchen.
Drive Palmira Kitchen Resale.
Palmira By Neighborhood.
Updating a kitchen from Palmira’s first build-out.
Palmira Golf & Country Club sits east of I-75 on Bonita Beach Road in Bonita Springs, roughly ten to fifteen minutes from Bonita Beach and Barefoot Beach and about twenty minutes from RSW. Its 27-hole Gordon Lewis golf course, played as the Egret, Ibis and Osprey nines, opened in 2001, and the homes around it went up through the 2000s, with some custom neighborhoods still filling in as late as 2014. That timing matters for a kitchen remodel. Most Palmira kitchens are now somewhere between twelve and twenty-four years old, which means the cabinet boxes are often still sound while the hinges, drawer slides, counters, sinks and appliances have reached the end of their useful lives.
The community is not one product type. The club describes thirteen neighborhoods mixing coach units, Mediterranean-style villas and custom estate homes, many facing a lake or a fairway. A kitchen plan that works in a two-story coach building on San Lucas Lane is the wrong plan for a pool home in a gated estate enclave, so we start every Palmira project by identifying the neighborhood, the builder and the structure before we talk about door styles.
What the original kitchens usually contain
Listings for Palmira neighborhoods describe the original kitchens in consistent terms: granite counters, stainless appliances, custom or semi-custom cabinetry, tile floors running through the open living areas and, in the larger plans, a center island. That was the standard for a well-appointed Southwest Florida home in the mid-2000s. What we typically find when we open those kitchens up is a two-level island with a raised bar ledge, raised-panel doors in a cherry or maple stain, soffits or stacked crown above the uppers, under-cabinet lighting on transformers, and a microwave mounted over the range in place of a real hood.
Most owners do not need the whole room gutted. The common brief is to flatten the island into a single working surface with seating, replace the granite with quartz or quartzite, take the uppers to the ceiling, swap shelves for full-extension drawers, and upgrade the cooking and ventilation. Where the floor tile runs continuously under the cabinets and into the great room, we plan the new layout around the existing tile footprint or budget for new flooring through the connected spaces, because a patch of matching twenty-year-old tile is rarely available.
How the plan changes by home type
Coach homes. The Enclave, for example, is 152 two-story coach residences that Toll Brothers developed between 2002 and 2006, with typical plans of about 2,060 to 2,600 square feet. In a building shared with neighbors, the drain and vent stacks, the exterior walls and often the roof belong partly to the association, so moving the sink across the room or cutting a new hood duct through an outside wall needs more than a design decision. We keep plumbing near its existing stack where we can, and where venting out is not practical we recommend a recirculating hood or an induction cooktop like InvisaCook that disappears beneath the counter.
Single-family neighborhoods. Caravella has 76 single-family homes built around 2003 to 2005, typically 1,800 to 2,500 square feet in ranch and two-story layouts with open living areas facing a screened lanai. Kitchens there are compact enough that ten or twelve inches of reclaimed space matters, so we look hard at pantry walls, corner cabinets and the bar ledge. Bellezza’s 22 homes, built from 2005 to 2014 by Harbourside and other custom builders, already have center islands and tend to need refinement rather than reconfiguration.
Estate enclaves. Avallone’s 35 gated homes, built 2005 to 2012 by Harbourside Custom Homes, range from about 2,500 to more than 4,000 square feet and all have private pools. Here the kitchen is part of an entertaining loop that runs out to the lanai, so we often coordinate the indoor kitchen with a summer kitchen, a beverage center near the pool door and lighting that reads well from outside at night. Villa Tuscany’s 30 Mediterranean-style homes, with tile roofs, stucco and arched openings, reward a warmer palette: rift oak or painted inset cabinetry, a plaster or wood hood, and stone with movement tend to look settled in those rooms, where a stark high-gloss kitchen can feel out of place.
Living at Palmira while the kitchen is rebuilt
Home ownership at Palmira includes access to the Renaissance Center Club, with indoor dining and a covered poolside restaurant, a lagoon-style pool, a lap pool, a fitness center, clay tennis courts, bocce, pickleball and a dog park. Owners who stay through the work lean on that dining room more than they expect; we set up a temporary coffee and microwave station elsewhere in the house so the weeks without a kitchen stay manageable. Owners who leave for the summer can give us access and receive photo updates instead, which is how most of our seasonal clients run the project.
Several Palmira neighborhoods are gated within the larger community, so we register every trade with the gate in advance and keep deliveries off the street during busy club hours. Cabinets and appliances are staged in the garage, not on the driveway, and dumpsters or haul-away trailers follow whatever placement rules your association sets.
Approvals, permits and paperwork
Read your governing documents before you sign anything: the master association covers the community as a whole, and some neighborhoods carry their own rules on work hours, contractor insurance and exterior changes. We assemble the drawings, product sheets and insurance certificates an architectural review typically asks for. Separately, any work involving new circuits, relocated plumbing or a wall change needs a building permit, and under Florida law most jobs over 2,500 dollars also need a recorded Notice of Commencement signed by the owner; when the direct contract is over 5,000 dollars, a copy goes to the permit office before the first inspection. We prepare that form for your signature. Induction cooking and added appliances can call for new dedicated circuits, so we check panel capacity during the scan rather than discovering a shortfall during rough-in.
How a Palmira kitchen project runs
It starts with a free consultation in your home, a LiDAR scan and a 3D render of the proposed kitchen, followed by a fixed-price contract. Cabinet orders go in once the design is signed, and that production window is when approvals and permits are processed. Demolition, rough-in and inspections follow, then cabinet installation, counter templating and fabrication, backsplash, appliances and final punch. Blane Perun leads design and selections; Jonathan Corcoran runs production, scheduling and the inspection sequence, so you have one person for each half of the job.
What to settle before you call
- Your neighborhood and home type: coach home, villa, single-family or estate.
- Whether the island stays, gets flattened to one level, or moves.
- How you want to cook and vent: gas, induction, a ducted hood or a hidden cooktop.
- Whether the floor tile continues into other rooms.
- Your timing around the season and any planned time away.
- A working budget, using the tiers and calculator above.
For the bathrooms, see our Palmira bathroom remodel guide.
More Palmira Kitchen Remodel Ideas
Palmira Neighborhoods & Buildings
Kitchen and bathroom remodeling guides for specific buildings, neighborhoods and topics inside Palmira.
Common Questions.
Let’s Start
Your Palmira
Kitchen Remodel.
Free 30-minute consultation. We bring the LiDAR scanner, the 3D render, and 20 years of Palmira project experience. You leave with a fixed-price contract or a clean walkaway. Zero pressure.
Key Takeaways
- Good tier at $21K, labeled Refresh, pairs modern shaker cabinetry and quartz counters with Visual Comfort lighting.
- Better tier at $35K, the most popular at Palmira, adds custom inset cabinetry, natural quartzite and Lutron Caséta lighting scenes.
- Best tier at $49K, labeled Signature, adds commissioned cabinetry, premium slabs like Calacatta and Patagonia, and a professional-grade Wolf or La Cornue range.
- Cutting Edge includes a free LiDAR scan and 3D render, followed by a fixed-price contract, with a typical timeline of 4-8 / 8-12 weeks.
- Florida law requires a recorded Notice of Commencement signed by the owner for most jobs over 2,500 dollars, and a copy goes to the permit office when the direct contract exceeds 5,000 dollars.