---
title: "Bonita Beach Club Remodeling — Kitchen & Bath | Bonita Beach FL"
url: https://remodelbycuttingedge.com/bonita-beach-club-remodel/
date: 2026-07-10
modified: 2026-09-12
lang: en
author: "Blane Perun"
description: "Bonita Beach · 25720–25740 Hickory Blvd · Kitchen & Bath Remodeling Bonita Beach Club —Kitchen & Bath Remodeling. Bonita Beach Club is the resort of the beach — the biggest..."
word_count: 965
---

# Bonita Beach Club Remodeling — Kitchen & Bath | Bonita Beach FL

## Key Takeaways

- Bonita Beach Club kitchen remodels range from $18K to $72K depending on scope, with standard timelines of 6–10 weeks including permitting.
- Bathroom remodels at Bonita Beach Club run $12K–$31K per bath, with standard timelines of 4–6 weeks including permitting.
- Post-Hurricane Ian building renovation replaced electrical, plumbing, and roof infrastructure, allowing kitchen and bath budgets to focus on finishes instead of remediation.
- Original-condition Bonita Beach Club units list at $465K while finished units reach $729K on the same ~$600K median complex, demonstrating renovation ROI.

Bonita Beach · 25720–25740 Hickory Blvd · Kitchen & Bath Remodeling

# Bonita Beach Club —Kitchen & Bath Remodeling.

Bonita Beach Club is the resort of the beach — the biggest beachside pool on Bonita Beach, tennis and pickleball on the sand side, and a 1977 building that came out of Hurricane Ian with new electrical, plumbing, and roof. The building is basically new; we make the interiors match, on fixed contracts built for association work.

[Book a Free Consultation →](https://remodelbycuttingedge.com/contact/)
[📞 (239) 469-6494](tel:2394696494)

9 YrsBest of Houzz
4.9★Verified Reviews
500+Projects Completed
FixedUpfront Pricing

The Property

## Built 1977. Rebuilt After Ian.Now the Units Have to Catch Up.

1977Year Built
~1,100SF 2BR/2BA Plans
LargestBeachside Pool on Beach
Post-IanNew Electric · Plumbing · Roof

Bonita Beach Club spans both the Gulf and bay sides of Hickory Blvd with an amenity package nothing else on the beach matches — the largest beachside pool on Bonita Beach, brand-new tennis and pickleball courts, a big fitness center, three community rooms, a game room, library, and an on-site manager. After Hurricane Ian the association renovated the buildings top to bottom: new electrical, new plumbing, new roof, with parking pavers on the way. The bones are effectively new.

Unit interiors are the last variable. Bonita Beach Club condos currently list from $465,000 for original-condition units to $729,000 for finished ones — same complex, same beach, same brand-new infrastructure. On a ~$600K median, a full kitchen-and-bath renovation costs a fraction of the spread it closes, and it rides on top of building systems the association just replaced. Few condos anywhere let a remodel connect to fifty-year-newer plumbing and wiring on day one.

Bonita Beach Club Kitchen Remodeling

## Kitchen Investment,Priced to Bonita Beach Club Comps.
[
Price Your
Bonita Beach Club
Kitchen Remodel
→
](/kitchen/)

Good$24KQuality stock cabinetry, entry quartz, updated appliances and lighting — a clean coastal refresh.
Better$45KSemi-custom cabinetry, premium quartz, layout tuning and full finish package.
Best$62K+Full custom cabinetry, natural stone, InvisaCook option — top-of-complex finish.

Bonita Beach Club kitchen remodels typically run **$18K–$72K** depending on scope — the same comp-driven model behind every community on this site, applied to the complex’s ~$600K median. Standard timeline is **6–10 weeks including permitting**; Rush delivery in 4–6 weeks carries a 20% upcharge.

Before![Condo kitchen before remodel - Cutting Edge Kitchen and Bath](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Pelican-Bay-Kitchen-Remodel-Before-c.webp)![Cutting Edge](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Logo.png)Remodel by Cutting EdgeAfter![Condo kitchen after remodel - Cutting Edge Kitchen and Bath](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Pelican-Bay-Kitchen-Remodel-Before-Cutting-Edge-Kitchen-Remodel-c.webp)![Cutting Edge](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Logo.png)Remodel by Cutting EdgeBefore![Condo kitchen before renovation - Cutting Edge Kitchen and Bath](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/pelican-bay-kitchen-reno-1-c.webp)![Cutting Edge](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Logo.png)Remodel by Cutting EdgeAfter![Condo kitchen after renovation - Cutting Edge Kitchen and Bath](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/pelican-bay-kitchen-reno-1-after-c.webp)![Cutting Edge](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Logo.png)Remodel by Cutting Edge

A 1977 Bonita Beach Club kitchen is a closed box — galley walls, dropped soffits, and cabinet runs that ignore the resort views the complex is famous for. In a ~1,100 square-foot two-bedroom, opening that box to the living area is the highest-impact move available, and because the association just replaced the building’s electrical and plumbing, new circuits and supply lines land on fresh infrastructure instead of fifty-year-old risers.

Materials are specified for a rental-friendly beach building: quartz that shrugs off turnover at the Good and Better tiers, marine-tolerant hardware, and fingerprint-resistant appliance packages, with natural stone reserved for the Best tier where owners want the finish that tops the complex’s comps. Every project is staged around BBC’s work-hour rules and elevator schedule so the unit never idles.

Bonita Beach Club Bathroom Remodeling

## Bathroom Investment,Same Math, Wet-Room Ready.
[
Price Your
Bonita Beach Club
Bathroom Remodel
→
](/bath/)

Good$12KRetiled shower, new vanity and counter, fixtures and lighting — the essential refresh.
Better$22KWalk-in shower with frameless glass, semi-custom vanity, designer porcelain, full waterproofing.
Best$30.5K+Curbless wet room, custom vanity, natural stone, heated floors — primary-bath luxury.

Bonita Beach Club bathroom remodels typically run **$12K–$31K** per bath. Standard timeline is **4–6 weeks including permitting**; Rush delivery in 3–4 weeks carries a 20% upcharge. Both bathrooms in one mobilization saves on both.

Before![Condo bathroom before remodel - Cutting Edge Kitchen and Bath](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Pelican-Bay-Bathroom-Before-c.webp)![Cutting Edge](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Logo.png)Remodel by Cutting EdgeAfter![Condo bathroom after remodel - Cutting Edge Kitchen and Bath](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Pelican-Bay-Bathroom-After-c.webp)![Cutting Edge](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Logo.png)Remodel by Cutting EdgeBefore![Condo bathroom before renovation - Cutting Edge Kitchen and Bath](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Pelican-Bay-Bathroom-2-Before-c.webp)![Cutting Edge](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Logo.png)Remodel by Cutting EdgeAfter![Condo bathroom after renovation - Cutting Edge Kitchen and Bath](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Pelican-Bay-Bathroom-2-After-c.webp)![Cutting Edge](https://remodelbycuttingedge.com/wp-content/uploads/2026/06/Logo.png)Remodel by Cutting Edge

With the building’s plumbing already replaced after Ian, a Bonita Beach Club bath remodel starts ahead: new supply and drain infrastructure behind the walls means the renovation budget goes into what you see and use — tiled walk-in showers, frameless glass, new vanities — instead of into fixing 1977. We still bring the waterproofing membrane and moisture-rated backer to current standards in every wet wall, because beach humidity finds shortcuts.

For a complex this rental-active, large-format porcelain delivers the stone look with turnover durability, and a tub-to-shower conversion turns a dated guest bath into the room listings photograph. The primary bath drives the appraisal: finished BBC units list around $729K against $465K originals, and the bathrooms are usually the loudest difference between the two.

Bonita Beach Club Remodeling FAQ

## Common Questions.

How are these Bonita Beach Club prices set?The same comp-driven model we use across Southwest Florida: package tiers scale to the complex’s ~$600K median residence value, so your finish level matches what BBC buyers pay for — without over- or under-improving. Your exact number is fixed in contract after a free LiDAR scan and selections.
Do you handle the association and building logistics?Yes — board approval packages, insurance certificates, elevator scheduling, work-hour rules, and debris plans are part of the job, the same playbook we run at Eden House on Fort Myers Beach and The Sandcastle on Marco Island.
Does the post-Ian building renovation change the remodel?It helps it. With new building electrical and plumbing already in place, kitchen circuits and bath supply lines tie into fresh infrastructure — more of your budget goes to finishes instead of remediation, and inspections go smoother.
Is it worth renovating a 1977 beach condo?At BBC the spread answers it: original-condition units list from $465K while finished units reach $729K — on a complex whose infrastructure was just rebuilt. Kitchens run 6–10 weeks standard (Rush 4–6, +20%); baths 4–6 weeks (Rush 3–4, +20%).

Related

[Casa Bonita — Bonita Beach](https://remodelbycuttingedge.com/casa-bonita-remodel/)
[Eden House Rebuild — Fort Myers Beach](https://remodelbycuttingedge.com/eden-house-remodel/)
[Kitchen Remodeling](https://remodelbycuttingedge.com/kitchen/)
[Bathroom Remodeling](https://remodelbycuttingedge.com/bath/)

## Your Bonita Beach Club Unit,Finished Like the Building Deserves.

Kitchen and bath remodeling at Bonita Beach Club and across Bonita Beach — fixed contracts, association-ready, sequenced to your season.

[Book a Free Consultation →](https://remodelbycuttingedge.com/contact/)
[📞 (239) 469-6494](tel:2394696494)